
Hotel Tower Structural Glazing — Airport City, Accra
Frameless structural-glazed elevation for an international hotel tower — silicone-bond QA, weathertightness verification and documented handover.

Headquarters Ventilated Rainscreen — Airport City, Accra
Ventilated rainscreen envelope for a financial institution's headquarters — drained cavity engineering, facility-audit-ready documentation, staged QC.

Diplomatic Mission Stick-Built Curtain Wall — Cantonments, Accra
Stick-built curtain wall for a diplomatic mission — vetted site personnel, sequence-controlled installation and written acceptance at every stage.

Corporate Tower Unitised Curtain Wall — Ridge, Accra
Factory-prefabricated unitised curtain wall for a corporate tower — crane-sequenced module lifting, inter-module gasket verification, programme-led delivery.

Solar-Optimised Facade — Corporate Offices, Airport City, Accra
Solar-control glazing and shading engineered for a corporate office facade — orientation mapping, SHGC-led glass selection, measured cooling-load benefit.
